UPM FRAY BENTOS TERMINAL – NUEVA PALMIRA

  1. Owned by UPM , private Co.
  2. Dock is 185 mtrs in length – Max. draft 7,00 mts fw at 0 level.
  3. To allow discharging only gear vsls. Cargo discharge operations to be done with ship´s cargo gear , working 24 hours , Shinc.
  4. Actual discharge rate per day – 24hrs – 4.500/5.000 mt – basis two gangs
  5. Restrictions : Maximum sized vessels up to 45.000 mt of DWT
  6. Vsl must has cranes  to lift min. 12mt.
  7. Working hours 24 hrs day/ shinc.
  8. Bunker available only by truck.
  9. Discharge bilges water, slop and garbage not available.
  10. Approaching channel allow to entering and leaving vsls simultaneously.
  11. Usual anchorage place is closed to berth/port limits.
  12. Since May till August , is the season´s time that could be strong winds , storm , rains.
  13. NOR usual tendered upon arrival at first place of anchorage / roads.
  14. Water density normally is  0,9985. 
  15. Vsls berth either by starboard side or port side.   
  16. Holidays:  January  01st  – May 01st  –   July 18th  –  August 25th   &  December 25th