ANP – GENERAL PIER – NUEVA PALMIRA

(ADMINISTRACION NACIONAL DE PUERTO)


  1. Owned by government
  2. One pier allocation shared with A.N.P. (National Port Administration) pier.
  3. Length  370 mts. South pier berth in ttl is 170 mtrs in length.
  4. To allow discharging only gear vsls. Cargo discharge operations to be done with ship´s cargo gear , working 24 hours , Shinc.
  5. Actual discharge rate per day – 24hrs – 4.500/5.000 mt – basis two gangs(Fertilizer/General cargo)

Also terminal count with a connection allowed to received UAN with the following specifications: –       Size of connections 8″, Flanges 8″, ANSI 150

–       Connection is a flexible hose

–       Max discharge rate about 650 MT per hour / max pressure 8 Kgs. / cm2

–       The cargo will be discharged to shore tanks                       

  • No restrictions up to » Post panamax» sized vessels.
  • Draft alongside 32 ft ,  0 wharton tide level.
  • Vsl must has cranes  to lift min. 12mt.
  • Working hours 24 hrs day/ shinc.
  • Bunker available only by truck.
  • Discharge bilges water, slop and garbage not available.
  • Approaching channel allow to entering and leaving vsls simultaneously.
  • Usual anchorage place is closed to berth/port limits.
  • Since May till August , is the season´s time that could be strong winds , storm , rains.
  • NOR usual tendered upon arrival at first place of anchorage / roads.
  • Water density normally is  0,9985. 
  • Holidays:  January  01st  – May 01st  –   July 18th  –  August 25th   &  December 25th