ANP FRAY BENTOS – GENERAL PIER – NUEVA PALMIRA

(ADMINISTRACION NACIONAL DE PUERTO)


  1. Owned by government
  2. One pier allocation shared with A.N.P. (National Port Administration) pier.
  3. Ultramar pier berth in ttl is 200 mtrs in length.
  4. To allow discharging only gear vsls. Cargo discharge operations to be done with ship´s cargo gear , working 24 hours , Shinc.
  5. Actual discharge rate per day – 24hrs – 4.500/5.000 mt – basis two gangs
  6. No restrictions up to » Panamax» sized vessels.
  7. Draft alongside 9,00 mts fw ,  0 wharton tide level.
  8. Vsl must has cranes  to lift min. 12mt.
  9. Working hours 24 hrs day/ shinc.
  10. Bunker available only by truck.
  11. Discharge bilges water, slop and garbage not available.
  12. Approaching channel allow to entering and leaving vsls simultaneously.
  13. Usual anchorage place is closed to berth/port limits.
  14. Since May till August , is the season´s time that could be strong winds , storm , rains.
  15. NOR usual tendered upon arrival at first place of anchorage / roads.
  16. Water density normally is  0,9985.